After confirming all the track positions, everything is lifted to drill more power and switch motor holes.
After confirming all the track positions, everything is lifted to drill more power and switch motor holes.
28th January 2006
Adam's First Module - Catashall Lane
Berkshire Area Group @ fotopic.net
Previous | Next

Added on 29th January 2006, has been viewed 287 times