Modular Layout Setup
14th April 2009
<-- Index | Showing 1-24 of 27 pictures | Next -->
Berkshire Area Group holds 'Running Days' on certain Saturdays in the year, and this collection shows various stages of setting up the Modular System to create one of our layout arrangements.
One of the club rooms.
One of the club rooms.
Modules start to arrive.
Modules start to arrive.
The process of aligning and clamping modules together.
The process of aligning and clamping modules together.
Testing track joints to make sure all is smooth for running.
Testing track joints to make sure all is smooth for running.
Fine tuning track joints.
Fine tuning track joints.
Control and Power are setup on the fiddle yard.
Control and Power are setup on the fiddle yard.
The fiddle yard is populated with everyones favourites.
The fiddle yard is populated with everyones favourites.
Running commences!
Running commences!
An evening session and everyone watches as a Class 73 hauling a Pullman set heads up the line towards them.
An evening session and everyone watches as a Class 73 hauling a Pullman set heads up the line towards them.
An evening session, and Peter (front/centre) has added his double module into the layout.
An evening session, and Peter (front/centre) has added his double module into the layout.
A stitched photo of our layout at the Berkshire Area Group OpenDay 2006
A stitched photo of our layout at the Berkshire Area Group OpenDay 2006
May 2006
May 2006
January 2007
January 2007
January 2007
January 2007
January 2007
January 2007
January 2007
January 2007
September 2008
September 2008
September 2008
September 2008
September 2008
September 2008
March 2009
March 2009
March 2009
March 2009
March 2009
March 2009
March 2009
March 2009
March 2009
March 2009