One of the club rooms. |
Modules start to arrive. |
The process of aligning and clamping modules together. |
Testing track joints to make sure all is smooth for running. |
Fine tuning track joints. |
Control and Power are setup on the fiddle yard. |
The fiddle yard is populated with everyones favourites. |
Running commences! |
An evening session and everyone watches as a Class 73 hauling a Pullman set heads up the line towards them. |
An evening session, and Peter (front/centre) has added his double module into the layout. |
A stitched photo of our layout at the Berkshire Area Group OpenDay 2006 |
May 2006 |
January 2007 |
January 2007 |
January 2007 |
January 2007 |
September 2008 |
September 2008 |
September 2008 |
March 2009 |
March 2009 |
March 2009 |
March 2009 |
March 2009 |
| | | |