Cutting & checking the wood |
constructing the baseboards |
Ensuring the boards fit in my car as planned |
laying the modular 4 tracks |
finishing off track laying |
more track laying |
Track Laying and Junction motors installed (indicated by the card rectangles under each point covering the hole) |
Trackwork complete |
Temporary wiring to test the DCC setup (A first for me) |
A look at the middle board join and the shoddy temporary wiring |
The unit boxed up for storage between work and displaying |
Adding legs to the layout. Despite only being 1ft deep the setup is suprisingly stable when pushed or nudged. |
With backscene boards in place the layout is much more protected when boxed up. |
Work on the final wiring begins. Also visible are the WoodLoC leg sockets. |
January 24th |
Final wiring style, much neater! |
Wider angle showing wiring progress |
Maintenance end showing addition of the fiddle yard |
The fiddle yard is added, with foam to reduce noise of back scene movement. The track taped down is the joiner piece that goes through the gap |
The smaller shed footprint |
The wash road intended to feature two wash houses |
Storage road end |
Maintenance shed end |
How the fiddle yard board is attached using L brackets |
| | | |