General Club Activities
24th June 2008
<-- Index | Showing 1-16 of 16 pictures | Index -->
A look at some of the things members busy themselves with when not running trains
Working on the Fiddle yard
Working on the Fiddle yard
sizing up a corner board for conversion to the bolt system
sizing up a corner board for conversion to the bolt system

priliminary point motor installation
priliminary point motor installation
Testing the rigidity of the new bolt system to connect modules
Testing the rigidity of the new bolt system to connect modules
testing a self operating module
testing a self operating module
Applying Graffitti to some VTG wagons
Applying Graffitti to some VTG wagons
preparing to ballast a corner board
preparing to ballast a corner board
Ballasting a corner board
Ballasting a corner board
Ballasting complete
Ballasting complete
New layout controllers fitted to the fiddleyard boards for easier setup
New layout controllers fitted to the fiddleyard boards for easier setup
The new controllers for the layout include extension optional hand held controllers for going walk about
The new controllers for the layout include extension optional hand held controllers for going walk about
A closeup of the new layout controller main units
A closeup of the new layout controller main units
Summer activities included building shelves for the storage shed
Summer activities included building shelves for the storage shed
shelves completed
shelves completed
shelves complete and club owned equipment packed away
shelves complete and club owned equipment packed away